Particulars |
Pellets |
Sized Ore |
Average Campaign Period |
120 days |
60 days |
Average yearly shutdowns |
3 |
6 |
Total time loss in shutdowns |
15 days |
30 days |
Total Productivity Loss |
4.16% |
8.33% |
Production Capacity (Per day) |
120 mt |
80 - 90 mt |
Fines generation in transit |
Nil |
2% |
Iron Lumps / Ore required per ton of sponge iron |
1.50 mt |
1.60 mt |
Fines (-5mm) in ore |
2% |
8% |
Coal consumption per ton of sponge Iron |
1.4 mt |
1.6 mt |
Electricity consumption |
50 units |
70 units |
Total cost of shutdown maintenance |
50% |
100% |
Sponge Iron Fines |
<10% |
>20% |
Cost of production of per ton of Sponge Iron |
Lower |
Higher |
Laterite |
0 |
2% |